同城叫小妹_全国同城空降快餐_全国同城空降快餐群最新活动_全国空降少女视频

上海金泰工程机械有限公司
上海安亭洛浦路45号 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130

 

主站蜘蛛池模板: 巫溪县| 长乐市| 绍兴市| 定襄县| 噶尔县| 彝良县| 昆山市| 行唐县| 安新县| 诏安县| 凌云县| 泌阳县| 宁城县| 灵丘县| 华蓥市| 铜山县| 伽师县| 蒙城县| 泸定县| 新营市| 久治县| 青冈县| 芷江| 汉阴县| 彭阳县| 中超| 蛟河市| 措勤县| 永福县| 张家港市| 关岭| 扶沟县| 白城市| 聂荣县| 天柱县| 乐东| 柯坪县| 沿河| 富民县| 英吉沙县| 新源县|